Turkmenistan GBS and Topsides and Jacket Load out for MMHE/TPGM
Client: MMHE/TPGM
Project: Petronas Carigali Block 1 Development, offshore Turkmenistan
Scope of work: GBSand topside load-out package
CHALLENGE:
To provided GBS and topsides Load-out package and personnel support for the Turkmenistan Block 1 Development MCR-A platform.
The first phase of the project involved the installation of the jacket, followed by the second phase of the float-over of the MCR platform topsides into position on the jacket.
SOLUTION:
The first phase of the project involved the Quayside GBS load-out followed by the installation of the jacket. The second phase involved the float-over of the MCR platform topsides into position on the jacket. The equipment was operated by a team of certified ACE Hire personnel, including a project manager, field project engineer and several winch operators and technicians on a rotational basis.
An extensive range of machinery from our hire equipment portfolio was provided to successfully complete the project. The equipment included 6 x 100te WLL double drum diesel mooring winches, 8 x 70te WLL single drum winches and 2 x 26te WLL abandonment and recovery (A & R) winches.