Technip
Client: Technip
Scope of Work: Refurbishment of Karmoy 80te SWL Pull In Winch
Project Details
ACE Services was commissioned by Technip to complete an on-site winch survey and subsequent overhaul and upgrade a Karmoy 80 tonne SWL Pull-In Winch.
- Strip down and inspection
- Winch drum modifications to modernise design under DNV2.22 rules and GAP analysis produced
- Upgrade of the brake system to a true mechanical auto fail safe brake system
- Manufacture of guarding fitted around the drum and brake assemblies