Star Gulf STB-1 and BP WA Topsides
Client: Star Gulf
Project: BP WA topsides installation, Baku
Scope of work: 2 x 120te Winches and 2 x 180kW Diesel HPUs
Project details
ACE Winches designed and manufactured two 120te winches and two 180kW diesel HPUs to assist with the installation of BP's WA topsides, offshore Azerbaijan. The equipment was installed onboard Star Gulf's STB-1 transportation barge. The project was completed successfully in 2005.