Spooling and 10 point mooring system
Client SAL Heavy Lift
ACE Winches supplied and mobilised 10 point mooring system, which included spooling of wire ropes. Mobilised from Singapore to the Cook Inlet in Alaskan waters for the installation of guide piles.
Scope of Supply
- 8 x ACE 60te WLL Hydraulic Drum Mooring Winches
- 2 x ACE 75te WLL Hydraulic Drum Winches
- 4 x ACE 157.5kW Safe Area Electric HPU
- 2 x ACE 110 Safe Area Electric HPU
- 10 x ACE 150te WLL Safe Area RLM
- ACE Hire Personnel