Shore Pull Package for Maheshkhali Floating LNG Terminal project

Shore Pull Package for Maheshkhali Floating LNG Terminal project

ACE Winches supplied the pull in spread equipment for the shore pull in of the gas pipelines for the Maheshkhali (Maiskhali) Floating LNG Terminal project, Bangladesh.


The pull in spread consisted of the ACE 500te Linear Winch, ACE Control Cabin, ACE Spooling Unit, ACE Equalising Sheave, Hold
Back Rigging and additional equipment. The 24” pipeline was installed from the clients Pipe Lay Vessel with the pipeline pulled to the beach. The total pulling distance was approximately 760m for pipeline.


The new terminal will further complement and enhance Bangladesh’s ability to reliably use the country’s domestic natural gas reserves. It will be the country’s first LNG import terminal and is expected to help secure the future provision of energy in the country.