Our client required an overhaul of an A-Frame, Winch and HPU within a short timeframe to meet project schedules.
The scope of work included a full inspection and re-engineer of the vertical support and lower pad-eye of the A-Frame. A full inspection was carried out on the winch, the brake units were replaced and then tested after installation. The existing umbilical also had to be removed and replaced.
A comprehensive review of the HPU took place, including a full functional check and electrical motors check. Any damaged parts such as the tank heater switch connector on the top of the tank was replaced.
Our teams successfully completed this work within the short lead time to allow our client to meet their project timeline.