Linear Winch Package for CELSE Gas Pipeline project, Brazil
The ACE 500te Linear Winch package carried out the pull-in operations of a 18” natural gas pipeline
running from the SSY base to shore, encompassing an offshore section of 6.5 km and a buried onshore
section of 1.5 km long.
Sergipe Thermoelectric Power Plant is located in Barra dos Coqueiros and will be responsible for converting natural gas into electricity. Using state-of-the-art technology, the plant’s construction is conducted by General Electric - GE and includesthree HA gas turbines and a steam turbine, in addition to generating heat recovery. This is the first venture in Brazil to receive this model of turbines HA, which was awarded with Guinness World Records, due to thehigh efficiency rate of converting energy from fuel to electricity.
Contact us
Contact us to request further information about our products and services