John Shaw Semi-Submersible Drilling Rig
We were awarded the task of rebuilding eight Skagit anchor winches onboard the John Shaw drilling rig.
All parts and components of the winches needed to be cleaned, blasted and painted.
Brake bank linings were removed, inspected, shot blasted and relined.
New bull gears and drive pinions were manufactured and installed, and the gypsy wheels required complete replacement.
All hydraulic cylinders and the main reduction gearboxes were overhauled and reinstalled.
FULL SCOPE OF WORK:
• Brake band linings removed, inspected,shot blasted and relined
• Manufacture and installation of new bull
• Gears and drive pinions
• Total replacement of gypsy wheels
• Overhaul of main reduction gearboxes
• Overhaul of all hydraulic cylinders
• All parts and components cleaned, blasted and painted
• SAT tested to DNV position mooring standard, during sea trials in the North Sea