ACE 200 Tonne Reel Drive System for Jankrik complex development project

ACE 200 Tonne Reel Drive System for Jankrik complex development project

ACE Winches was awarded the contract to supply TechnipFMC an ACE 200te Reel Drive System for Jankrik Complex Project.


The Jangkrik project located in the Muara Bakau PSC working area, approximately 70 kilometers off the coast of Makassar Strait, Indonesia, at water depth ranging from 200 to 430 metres.


ACE Winches carried out the installation of 51 kilometers of umbilicals using the hire package comprising of ACE 200te Hydraulic Reel Drive System, ACE 172kW Safe Area Electric Hydraulic Power Unit, ACE Reel Drive System Project Container and ACE 40 Metre Modular Track System. 