Topside & Jacket Installation
We have engaged with clients across the globe to provide specialised and unique equipment to suit their topside and jacket installation requirements.
Our teams successfully developed and fitted load-out and installation work for the following projects:
- MMHE/TPGM and the Petronas Carigali Block 1 Development, offshore Turkmenistan
- Support the load out of the world’s largest platform topside for the Piltun Project, off the Sakhalin Islands, Russia
We can provide high quality equipment and expert personnel for your project, providing exact positioning and precision-controlled installation processes.
With an extensive hire fleet and a bespoke manufacturing division, we are committed to delivering projects at a high standard and maintaining an excellent record of safety, quality and reliability.
Contact us about how our range of equipment and specialist personnel can support your topside and jacket installations.
Contact us
Contact us to request further information about our products and services
Case studies
-
ACE Winches supplies winch solution for the DolWin Topside Float-over
ACE Winches, a leading global supplier of specialised marine deck machinery, successfully mobilized and installed a winch package for use on the jacket installation and float-over of the DolWin Topside platform.
-
Platform Installation Package for Aasta Hansteen Topside Transfer
ACE Winches successfully delivered a solution to support the Aasta Hansteen Spar Platform Installation by transferring the topside from White Marlin, a semi-submersible heavy transport vessel, to two S-Class vessels for a dual vessel float-over.
-
Topside Load-out Package, Zawtika Project
ACE Winches supplied a topside load-out package to Saipem for installation of the ZPQ topside on the Zawtika field, located in the Gulf of Martaban, offshore Myanmar.