Yuri Korchagin Project, Topside Load-out

Scope of Supply

1 x ACE 120te Topside Load-out Winch Package
6 x ACE Operational Personnel

LSP-1 and LSP-2 Platforms

LSP-1 is the primary production facility at the Yuri Korchagin field, performing drilling and process operations. The platform is supported by the LSP-2 accommodation unit.
The two structures are bridge-linked and comprise a standard GBS and topsides arrangement in a water depth of 13m in the North Caspian Sea.