Successfully completing the pipeline shore approaches works at KSA Manifa and Tanajib for Saipem, ACE Winches supplied an ACE 500te SWL Hydraulic Linear Winch Package and associated personnel.

The Manifa water injection system consisted of four main pipeline flanks. The injection system is supplied from the Wasia Aquifer in Abu Hadriyah through 56 inches, 49km internally coated carbon steel pipeline.

The project was part of the development of the Saudi oilfields, which expects to see an increase in production to over 12.5 million barrels a day from 11 million barrels a day.